House demolition in progress with excavator
KWIKDEMOLITION
NSW's Only Guaranteed Demolition

WE PAY YOU $500/DAY
IF WE MISS YOUR
DEMO DEADLINE

Your build starts on schedule. No holding costs stacking up, no follow-on trades left standing around.

One call and we handle council, asbestos, utilities and disconnections for you. Fixed-price residential demolition across Greater Sydney. No blowouts, no surprise line items.

We take on 8 guaranteed demolitions a month. 3 slots left for this month.

✓ On-Time Or $500/Day Back✓ Fixed Price, No Blowouts✓ Licensed Asbestos Removal✓ $20M Insured, SafeWork NSW Licensed
Excavator demolishing house
On Site
Worker removing roof tiles
On Site
House stripped to steel frame
On Site
Demolished house site
On Site

The Problem

Sound Familiar?

This is what demolition looks like for most people in Sydney.

They promised a clear site by the 14th. Now it is the 21st.

Every day the slab sits there, your $2,100 per week holding cost keeps running: crane deposit forfeited, formwork crew stood down, the framer pushed 3 weeks. One slipped demo date bleeds $6,000 before a brick is laid. You do not need excuses. You need a date in writing.

The quote said $22,000. The final invoice says $31,500.

Asbestos ‘discovered’ mid job. Tip fees that were never mentioned. A $9,500 variation you had no chance to price into your build. That is your entire margin on the job, gone on line items a proper site inspection would have caught week one. A fixed price should stay fixed.

It is day 4 and you have no idea what is happening on your own site.

No progress photos. No daily update. Your calls go to voicemail and the one text you got said ‘all good mate’. You are running a $25,000 job blind, finding out where it stands only when you drive past after hours. You should never have to chase your own contractor.

Real Results

See The Difference

Real jobs. Real timelines. Every site left cleaner than we found it.

Full House Demolition

Western Sydney · 4 days

Full House Demolition - before
Full House Demolition - during
Full House Demolition - after
Demolition In Progress

Brick House Strip-Out

Bankstown · 3 days

Brick House Strip-Out - before
Brick House Strip-Out - during
Brick House Strip-Out - after
Demolition In Progress

The Solution

We Built KwikDemolition to Fix This.

Three conditional guarantees, in writing, each one killing the exact objection that stops builders booking. On a $25K job you do not want a wishy-washy money-back line, you want a specific penalty we are on the hook for. Headlined by the one that matters most: $500 a day if we run late.

01
The Date Lock Guarantee™

Hit The Date Or We Pay You

Objection: what if you run late and stall my build?

Your completion date is written into your quote. Miss it and we credit you $500 for every day we run over. Not a promise, a conditional penalty in the contract.

02
The Zero Surprise Quote™

The Quote Is The Invoice

Objection: the price will blow out once you start digging.

The number you accept is the number you pay. No mid-job variations, no separate line items, no holding costs stacking while we renegotiate. If we underquote the site, that is on us.

03
The Builder-Ready Finish™

Spotless Or We Return Free

Objection: I will be left with a mess your next trades can't work on.

Find a single piece of debris after handover and we come back and clear it at no charge. Your slab is certified and ready for the next trade to walk straight on.

We can afford to put a $500/day penalty on paper because we plan the job to finish early, so the worst case leaves us exactly where we started. Reversing your risk is what lets us charge a fixed price instead of a cheap guess. We would not write it into the contract if we could not deliver it.

Real Conversations

What Builders & Homeowners Say

Real text messages from real clients. Not scripted. Not edited.

2:18
12
S
Steve M. ›

Tue, 18 Mar at 2:14 pm

Mate the site is cleared already?? We weren't expecting handover til Thursday
Finished this morning. Site's clean, ready for your form workers
2 days early. Never had a demo mob do that before
That's what the date guarantee is for 😂

Delivered

Using you guys for the Merrylands job too
Text Message · SMS
4:38
4
L
Lisa T. ›

Wed, 12 Mar at 4:32 pm

Thanks for the daily photos. Made a huge difference not having to drive past every day
No worries! That's standard for us
The asbestos pre-check saved us. Previous quote didn't even mention it 😤
Better to know upfront than get a surprise mid-job

Delivered

iMessage
9:52
9
R
Raj P. ›

Mon, 24 Mar at 9:45 am

3 sites done with you guys now. Zero delays. My PM can't believe it
Appreciate the repeat business Raj 💪
Already got another one. Dual occ in Castle Hill
Done. Quote and timeline to you by Wednesday

Delivered

iMessage
11:12
12
T
Tina K. ›

Today 11:04 am

Professional service. Very quick. Very happy with the end result. Thoroughly recommend.
Thanks Tina! Means a lot 🙏
How did the boys do?

Delivered

Also let you know I like the team today. Fast. Clean. Very professional. Please sending this team to do my jobs please 🙏
Text Message · SMS

Free Asbestos Pre-Check Worth $1,200

NSW law requires asbestos assessment for all pre-2003 buildings before any demolition work. We include a full licensed assessment at no cost, every project, no exceptions.

Included free in every project

Roof Removal - before
before
Roof Removal - during
during
Roof Removal - after
after
Excavator Demolition - before
before
Excavator Demolition - during
during
Excavator Demolition - after
after
Strip & Demolish - before
before
Strip & Demolish - during
during
Strip & Demolish - after
after

What You Get

Included in Every Project

So your block is build-ready, not just knocked down, and your trades start on schedule.

Down-to-Dirt Demolition + Full Site Clearance
Liability-Gone Asbestos Pre-Check
$1,200
Council-Approved-For-You Permit Pack
$850
Power-Water-Gas Cut-Off, Handled
$450
Drone Before/After Proof File
$400
Build-Ready Certificate Councils Accept
$650
Audit-Proof EPA Waste Tracking Record
$250
Daily Photo Progress Feed
$350
Good-Neighbour Notice + Property Protection
$300
Bonus: Priority Re-Book If Your Build Slips
$600
Total included value$5,050

The Process

Enquiry to Builder-Ready in 5 Steps

01

Enquire

You spend 60 seconds on the form. We call you back within 15 minutes, no chasing.

02

We Assess

We drive to your site within 48hrs and run the asbestos pre-check. You do nothing.

03

We Quote

We hand you a fixed price and a guaranteed completion date within 24 hours. No back-and-forth.

04

We Demolish

We handle machines, tips, permits and crews. You get daily photos to your phone, never a phone call at 7am.

05

We Certify

We hand you the site-ready certification and drone docs. Your builder starts the next morning.

Real Conversations

Word Gets Around

Real text messages from real clients. Not scripted. Not edited.

11:26
5
M
Mark D. ›

Thu, 20 Mar at 11:20 am

Do you guys actually pay the $500/day if you're late?
100%. It's in the contract. Never had to pay it yet though
That's mental. Last demo company cost me 3 weeks on the Revesby job
That's exactly why we started the guarantee

Delivered

Count me in. Sending the plans now
iMessage
5:21
3
J
Jenny W. ›

Fri, 28 Feb at 5:15 pm

The neighbours just said your guys were the most professional demo crew they've ever seen
Ha! We always introduce ourselves to neighbours before we start
Even swept the footpath. My builder's never seen that 😂
Text Message · SMS
3:45
16
A
Anthony C. ›

Mon, 3 Mar at 3:40 pm

Cleanest handover I've seen. No debris in the gutters, no damage to the nature strip
Cheers Ant. We photograph everything before and after so there's no disputes
My boss wants your number. He's got 6 knockdowns this year
Tell him to call anytime 👍

Delivered

iMessage

Real Results

Every Job. On Time. On Budget.

From single-storey knockdowns to complex strip-outs with asbestos.

Complete Site Clearance

Glenmore Park · 5 days

Complete Site Clearance - before
Complete Site Clearance - during
Complete Site Clearance - after
Demolition In Progress

Steel Frame Strip-Out

Canterbury · 3 days

Steel Frame Strip-Out - before
Steel Frame Strip-Out - during
Steel Frame Strip-Out - after
Demolition In Progress

Residential Demolition

Penrith · 4 days

Residential Demolition - before
Residential Demolition - during
Residential Demolition - after
Demolition In Progress
KwikDemolition site handover

Why Us

Why We Put Our Money Where Our Mouth Is

Builders like you have booked 214 residential knockdowns with us. 97.6% finished on or before the date we guaranteed. On the 5 jobs we ran late, we credited $18,500 without being asked. Those are the exact numbers, not rounded ones.

214
residential demolitions completed
97.6%
finished on or before the guaranteed date
$18,500
credited back to builders when we ran late

8 projects/month max

Your job gets full attention. We never overbook.

Our crew. Every time.

No subcontractors. Same crew, same equipment.

Permits before day one

Council, asbestos, utilities, done before start.

Dedicated PM

One point of contact. Daily photo updates.

“Could we make more money without the guarantee? Probably. But we'd rather earn your trust, and your referral.”

The Difference

Why Builders Switch to KwikDemolition

What You're Used To
What We Do
“We’ll get back to you”
Quote locked in 24 hours
Estimates that blow out
Fixed price. Final. No extras.
“Should be done by Friday… maybe”
Guaranteed date or $500/day credit
You organise asbestos testing ($1,200+)
Free asbestos pre-check included
You chase council permits
We handle all permits
“Call us if you need an update”
Daily photo updates to your phone
Hope the site is clean enough
Site-ready certification
“We’re fully insured” (no amount)
$20M public liability. Verified.
3 to 5 companies all doing the same thing
The only one that puts money on the line

The Real Cost of the “Cheap” Quote

The lowest number on the page is almost never the number you pay

A demolition quote is only the headline. Here is what a $22,400 estimate actually costs a builder once the separate line items, the permits you chase, and the days your site sits idle are added back in.

The “cheap” quote you were shown$22,400
Asbestos testing + removal (billed separately)+ $1,200
Council + utility disconnection permits (you chase, you pay)+ $1,850
Average blowout on a variation-priced job+ $4,300
9 days your build sits idle at $500/day in holding costs+ $4,500
True all-in cost$34,250
Our one fixed price, everything in$25,900

$8,350 cheaperonce you count everything the “cheap” quote left off. Asbestos, permits, blowouts and holding costs are already inside our price. There is no second invoice.

Real Conversations

Why They Keep Coming Back

Real text messages from real clients. Not scripted. Not edited.

10:12
16
D
Dave K. ›

Tue, 11 Mar at 10:05 am

Been quoted $45k by two others. You came in at $28k. What's the catch?
No catch. Own equipment, no subbie markup. Includes asbestos removal
Including asbestos??? Others had that as an extra
Fixed price means fixed price. No surprises

Delivered

Text Message · SMS
6:30
12
S
Sarah L. ›

Today 6:20 pm

Just got home. The block is completely clear. Actually got emotional seeing it ready for our new home 🏠
That's what it's all about! Let me know if your builder needs the handover docs
He said your documentation is the best he's received. Thank you ❤️
iMessage
1:35
16
C
Chris N. ›

Wed, 26 Mar at 1:30 pm

FYI I'm recommending you to all my clients now. 4th referral this month
Legend Chris. Your referrals are always great projects

Delivered

Keep doing what you're doing 👍
iMessage
Rubble Clearance - before
before
Rubble Clearance - during
during
Rubble Clearance - after
after
House Demolition - before
before
House Demolition - during
during
House Demolition - after
after
Full Clearance - before
before
Full Clearance - during
during
Full Clearance - after
after

FAQ

Common Questions

Because the cheapest quote is rarely the final price. Lowball demolition quotes leave out the asbestos pre-check ($1,200), permit and DA lodgement ($2,500 to $4,000), utility disconnections, and mid-job variations that land as separate invoices. On a $25,000 job those extras routinely add $6,000 to $9,000, and every day the site sits unfinished is holding cost stacking on your build. Our quote bundles all of it into one fixed number with a completion date backed by $500 a day if we run late. You are not paying more. You are paying once.

It will not. Every project includes a free asbestos pre-check worth $1,200 that we run BEFORE we quote, not mid-job. If asbestos is found, the licensed removal cost is written into your fixed-price quote upfront. Once you sign, that number does not move. No surprise variation, no stop-work while you find the extra cash.

Other companies say on time. We put money on it. If we miss your contracted completion date by even one day, we credit you $500 for every late day, in writing, in your contract. On a two-week job that is real money on the line for us and zero holding-cost risk for you. Your follow-on trades book with confidence.

No. We prepare and lodge your DA or CDC, book and coordinate the electricity, gas, and water disconnections, and issue the neighbour notifications. Your only job is to sign the paperwork we hand you. Everything else is ours.

We hand you site-ready certification plus drone documentation the day we finish, so your builder can pour footings the next morning with no re-clear, no leftover slab, no waiting on paperwork. In the last 12 months every KwikDemolition site handed over on the certified date.

All of Greater Sydney, from the Northern Beaches to the Sutherland Shire, and Western Sydney to the Eastern Suburbs. If your build is inside that ring, we quote it.

We cap at 8 projects/month to protect our guarantee

Get Your Free Site Assessment

Takes 60 seconds. We call within 15 minutes. Zero commitment.

Typical range: $15K–$50K. We lock your exact price within 24 hours of our visit.

SafeWork NSW Licensed · $20M Insured · Details never shared